Client: Fagioli Canada
Status: Completed February 2017
Pennecon offered a variety of services and equipment to Fagioli Canada during the installation of the Hebron Topsides modules. The bulk of the work involved handling, assembling and disassembling in excess of 10,000 tonnes of highly specialized equipment that was utilized to lift and transport various modules. Some of this equipment included a heavy lift elevator structure; a proprietary hydraulic horizontal skidding system; a Liebherr LR11350 heavy lift crane and multiple SPMT axles.
Additional project work included:
- the execution of barge and vessel mooring
- loading & unloading operations
- various hot works for grillage installations
- barge sea fastening
- creation of Field Installation Work Packs and construction schedules
- managing field installation and construction activities