CLIENT: Tideway
STATUS: COMPLETED 2015
This project included the construction of a marine loadout terminal and access road. This required the crushing of 490,000 tonnes of ¾-inch to 6-inch aggregate, transporting it to the marine terminal, and loading it aboard Tideway’s ship.
Project Highlights:
- 490,000 tonne of aggregate
- 3/4” – 6” aggregate