Client: deer lake power
Status: completed
scope:
Transformer HV lead repairs, modifications, oil filling and testing.
Project highlights include:
- Repair of transformer lead inside main tank from transformer winding.
- Braze new connecter on the end of the lead for connection to bushing cap.
- Supply, circulate and vacuum dry new reclaimed transformer oil.
- Oil fill transformer.
- Final oil sampling.
- Final commissioning and electrical testing of transformer
- Completed on time and within budget.