CLIENT: ProEnergy Solutions
STATUS: COMPLETED february 2015
Project scope included the install of a 100MW Siemens gas turbine, as well as two fuel tanks at the Nalcor Energy facility in Holyrood, NL.
Work included:
Install Combustion Turbine Generator
- Air inlet
- Exhaust stack
- Control oil skid
- Starting package
- Lube oil coolers
- Compressor wash/water injection skids
Install Liquid Fuel System
- Liquid fuel tanks
- Containment berm
- Liquid fuel offloading
- Liquid fuel pumps
Install Buildings and HVAC
- Combustion turbine generator building
- Electrical control building
- Black start and fire/water building