Client: NeWind Group Inc.
Status: Completed November 2008
Pennecon proudly constructed Newfoundland and Labrador’s first commercial wind farm. Crews constructed the access road, prepared the site, and erected nine Vestas V-90 3 MW wind turbine generators with concrete foundations. Beyond on-site construction, Pennecon also provided a full range of services associated with the wind-to-wire design and installation of the turbines. This included the installation of a 25 kv energy collector system, a 25/66 step-up transformer, and plugging the 66 kv transmission line into the province’s energy grid.