CLIENT: Newfoundland & Labrador Hydro
STATUS: completed October 2018

This project consisted of the rehabilitation and completion of upgrades to the existing Grand Falls Main Dam located in Grand Falls, NL. The scope of work included, but was not limited to:

  • the stabilization of the existing concrete gravity dam
  • installation of new pedestrian & vehicle bridges
  • installation of a new inflatable dam which included the installation of a new control building and all technical & electrical work
  • installation of a cofferdam
  • construction of a new 250m long concrete spillway