CLIENT: ProEnergy Solutions
STATUS: COMPLETED february 2015

Project scope included the install of a 100MW Siemens gas turbine, as well as two fuel tanks at the Nalcor Energy facility in Holyrood, NL.

Work included:

Install Combustion Turbine Generator

  • Air inlet
  • Exhaust stack
  • Control oil skid
  • Starting package
  • Lube oil coolers
  • Compressor wash/water injection skids

Install Liquid Fuel System

  • Liquid fuel tanks
  • Containment berm
  • Liquid fuel offloading
  • Liquid fuel pumps

Install Buildings and HVAC

  • Combustion turbine generator building
  • Electrical control building
  • Black start and fire/water building